Installation Guide

Caution: Be sure to turn o hot and cold water supplies
before installing or servicing faucet.
Installation Procedure
1. Push valve bodies through holes in sink from
underneath. Make sure ange nuts and mounting
washers are on underside of sink. Valve with red striped
hose (hot) is on the le and blue (cold) is on the right.
Put gasket (LN-129) over valve body. read escutcheon
(LN-128) onto valve body. e top of the valve spindle
should measure 1-7/8” from mounting surface (See
rough in drawing).
2. read collar (LN-112) on to valve body until it reaches
the escutcheon (LN-128).
3. CRP handle installation: Ensure valve spindle is rotated
to the OFF position. Place handle on valve spindle and
thread screw (LN-121A) into valve.
4. Tighten ange nuts and mounting washers from
underneath sink and secure with mounting screws if
necessar y.
5. Install spout (LN-254A) and centerbody (LN-188)
through center in sink hole from above sink. Secure
spout to sink with washer (LN-138) and nut (SPF-26).
Washer (LN-138) at side should face back of the sink.
read tee (LN-189) to bottom of centerbody (LN-188).
6. read ex hose adapters into tee (LN-189) using pipe
sealant on the threads. Attach ex hoses to ex hose
adapters.
7. Connect hot supply to le tube and cold supply to right
tube using appropriate connectors.
8. Pop-up drain installation:
a ) Remove pop-up plug, tail piece and ange from
the drain body. Make sure that locknut is threaded
all the way down onto the body with at friction
washer in middle and beveled washer on top.
b ) Apply plumbers putty or sealant to bottom of
ange.
c ) Install drain body through drain opening in
lavatory and screw ange onto the drain body
making sure that the threads are completely
engaged for proper sealing and strength of the
connection. Apply joint compound to all threaded
parts to insure proper seal. Apply putty or teon
tape to tail piece before attaching to drain body.
d ) Tighten locknut to compress the beveled ange
evenly across the bottom of the drain opening taking
care not to over tighten the locknut, causing damage
to the lavatory. Apply teon tape (clockwise) on tail
piece and thread into outlet of body.
e ) Insert pop-up plug and pivot rod into body and
tighten retaining nut until the ball is seated on the
ball washer.
Note: e pop-up plug can be installed either in the
removable or non-removable position, depending
on the location of the hole located in the guide at
the bottom of the plug.
f ) Slide the pivot rod through one side of the spring
clip, then the appropriate adjustment hole and then
other side of the spring clip.
g ) Insert li rod through faucet housing and the top of
the li strap and secure it in place by tightening the
screw.
Note: To insure proper operation of li rod and
pop-up, some adjustment of the linkage may be
required.
ere are two possible adjustment points:
1) li strap to li rod
2) li strap to pivot rod
8. It is very important to thoroughly ush the supply lines
to prevent foreign matter, i.e. copper chips, sand, stones,
etc. from damaging the sealing surfaces of cartridge.
Remove aerator and open hot and cold to full open then
open both supplies. Let water run through hot and cold
long enough to ush supply lines thoroughly. Shut o
faucet and replace aerator. Check for leaks.
Replacing cartridge (KN-113 or KN-114):
1. Remove plug button (LN-243H or LN-243C), loosen
Phillips head screw (LN-121A) and remove handle (LN-
177).
2. Remove collar (LN-112) by turning counter clockwise.
Caution: Do not use wrench as this may damage the
surface nish.
3. Place wrench on cartridge hex nut (KN-113, KN-114).
Turn wrench counterclockwise until cartridge is
removed.
4. Install new cartridge. Turn cartridge with wrench until
cartridge does not turn easily then turn 1/4 to 1/2 turn
further. Reassemble handle in reverse fashion.
Widespread Lavatory Faucet SLW-4412
Installation and Service Instructions
Carrington
®
Faucet meets ASME A112.18.1/CSA B125.1, NSF/ANSI 61.9,
NSF/ANSI 372, WaterSense at 1.0 gpm & 1.5 gpm
Certied by
NSF International

Summary of content (2 pages)