Dimensions

ImportantInformationtoRe viewBeforeyouOrderyourSymphonydoor:
TheSymphonyproductisdesignedtoprovidetheoptimumappearanceofatrue“frameless”showerdoor.
Thehingeandclipsystemprovidestructuralsupportfortheenclosurewhilemaintainingaclean,
unclutteredappearance.Manycompetitorsinstalltheirfixedpanelsindeepextrudedaluminumchannels
toprovideadjustabilityand“stretchtheirsize
offering.Weachievethesameobjectivebyofferingunitsin
¼”incrementstoprovideacustomfitwithastockproduct.Howeverthisapproachmakesaccurate
measurements,includingcheckingwallsforplumb,akeytoasuccessfulinstallation.Measurementsshould
onlybemadeonyourfinishedopening.Donotmeasure
unfinished,studtostudopeningsandattempt
toadjustforthethicknessofthetile,granite,etc.Curbmustbe21/2”wide.Also,thisunitcannotbe
installedonFiberglassorAcrylicstallsiftheareawherethewallmeetsthecurbisrounded.
Recordyourmeasurementsonthe
appropriateMeasuringSheet4Aor4B
Step1.Determineyourpreferredunit
height,76”or80”andmarkwithapieceof
tapeonbothwalls.
Step2.Usingagoodqualitytapemeasure,
determinetheopeningatthecurb,mid
point(halfoftheunitheight)andatthetop
oftheunit.Ifthesedimensionsarewithin
1/8”ofeachother,youwallsaremostlikely
plumb.Howeveritisagoodpracticeto
alwayscheckthewallsforplumb.
Step3 Knowing
thewallconditionsis
criticaltoagoodinstallation.FollowStep3
todeterminetheexactconditionofeach
wall.
Use the Measuring Sheet
Measure@Curb“A
Measure@MidPoint
“B”
Measure@TopOfUnit
”C
UnitHeight=76”or80”
HingeFromLeft
Wall
HingeFrom
RightWall
Determine the Position of Your Door
SymphonyFramelessDoor&Panelenclosuresarecompletelyreversible,thedoormay
beinstalledontheleftorrightwall.Normallythedoorisinstalledclosesttotheshower
headasshownin“Aand“B”below.Thedoorswingsbothinandout.Tomeetsafety
codestheoutswingofthedoorcannotberestrictedasshownin“Cbelow
2
UseMeasuring
SheetA
UseMeasuring
SheetB

Summary of content (5 pages)