Instructions / Assembly

®
System 1738 Installation Methods8
Flat Roof Terminations
(i) Snorkel termination: On flat roof installations the air
intake and the exhaust vent terminations must be a
minimum of 24 inches above any parapet, vertical
wall or structure within 10 feet horizontally. (see
Figure 10)
(ii) Concentric Vent Kit termination: When installing
a concentric termination vertically through a flat
roof, the termination’s vent cap must be a minimum
of 10 feet away from any parapet, vertical wall or
structure. (see Figure 11)
Figure 10: Flat Roof Snorkel Termination Figure 11: Concentric Vent Flat Roof Snorkel Termination
24" minimum
height above
If less than 10’
Intake air/vent
termination must be
minimum of 24" above
any parapet, vertical
wall or structure within
10’ horizontally
Air intake
termination
shown here
System1738
Roof Flashin
g
Concentric termination must
be a minimum of 10’
away from any parapet,
vertical wall or structure
System1738
Roof Flashin
g
These minimum code requirements are not
appliance specific. Appliance manufacturers may
supply clearance requirements specific to each
appliance. In this case, the appliance manufacturers’
requirements if more stringent shall supersede these
described herein.
The information above is in accordance with
the requirements of the 2018 edition of the NFPA
54 / ANSI Z223.1 National Fuel Gas Code. These
requirements shall always be superseded by
requirements in latest edition of the code.