VTR 100B LITE Installation and Service manual v2

Table Of Contents
Installation |
9
Recommended installation location for the outdoor air intake is the northern or eastern side of the building and with a
distance to openings for discharge of stale ventilation air, kitchen ventilator, central vacuum system, waste water drain-
age and other pollution sources like exhaust from traffic etc. Stale discharge air should ideally be led via a roof unit to
the outside and with a good distance to any outdoor air intake, windows etc.
4.2.1 Wall preparation for mounting bracket
The unit should be installed in such a way that there is no
vibration noise coming from the wall on which the unit is
installed.
Important
Make sure to read all instructions before
proceeding with installation procedure.
Installation steps can vary depending on the
type of installation.
1. Prepare the surface where the unit is to be mounted. Make sure that the surface is flat, vertical and that it supports
the weight of the unit. Perform the installation in accordance with local rules and regulations.
Fig. 7 Surface preparation.
C concrete/bricks, W wood block, G gypsum, M mineral wool
If the wall is from a thick concrete or bricks, no special preparation is needed (figure 7, pos. A), otherwise make nec-
essary adjustments (figure 7, pos. B). The unit weights 48 kg.
Make sure there is a power socket is located nearby the unit, preferably above it. It must be earthed. VTR 100/B LITE
power cable length is 1 m and it comes out from the top left side in right version units and from the right top side in
left version units. Choose power socket location accordingly.
212962 | v02