Installation Instruction
Table Of Contents
- 1 Product information
- 2 Overview
- 3 Warnings
- 4 Unloading from trailer
- 5 Transport and storage
- 6 Unpacking
- 7 Duct connections
- 8 Internal components
- 9 Installation
- 10 Purge sector
- 11 Electrical connections
- 12 Connect the water heating coil
- 13 Access control system
- 14 Connect accessories in Control unit CU27-C
- 15 Dimension and weight
- 16 Technical data
- 17 Additional equipment
- 18 Disposal
- 19 EU Declaration of Conformity
- 20 UK Declaration of Conformity
14
| Installation
9.3 Attach the Access control cabinet
Caution
Keep the Access control cabinet including the CU27-C away from direct sunlight.
For Topvex SR70–100 and TR20–80, the Access control cabinet is mounted on a bracket. Mount the bracket and Access
control cabinet with the supplied screws. The air handling unit has pre-drilled holes for this purpose.
For Topvex SR20-60 the Access control cabinet is mounted on top of the air handling unit at delivery.
Table 1 Attach the bracket and Access control cabinet
Topvex SR70–100
x4 7mm
Topvex TR20–80
x4 7mm
254050 | A004