Operation instructions Danfoss ENG
130BD529.11
1
2
3
4
5
6
7
8
PE
U
V
W
9
L1
L2
L3
PE
10
11
1 PLC 6 Cable connector
2 Adjustable frequency drive 7 Motor, 3-phase and PE
3 Output contactor 8 Line power, 3-phase and reinforced PE
4 Grounding rail (PE) 9 Control wiring
5 Cable insulation (stripped) 10
Equalizing min. 0.025 in
2
[16 mm
2
]
Figure 4.2 EMC-compliant Electrical Connection
NOTICE!
EMC INTERFERENCE
Run cables for input power, motor wiring and control wiring in three separate metallic conduits. Failure to isolate
power, motor and control cables can result in unintended behavior or reduced performance. Minimum 7.9 in [200 mm]
clearance between power, motor and control cables is required.
Electrical Installation Instruction Manual
14 Danfoss A/S © Rev. 11/06/2014 All rights reserved. MG11AK22
44