Corrigo ventilation 3.4 manu

Manual Corrigo Ventilation, revision R Chapter 17 Configuration 103
Press RIGHT to select which expansion units are to be connected.
Expansion unit1
None
Expansion unit2
None
Then go a step down to select which frequency converters are to be connected. For additional
settings for frequency converters, see appendix at the end of this document.
Type of freq conv
connected on Modbus
None
Dual? No
Expansion unit and external display
Function port1
Exp and ext display
An expansion unit and external display can be used on the same port simultaneously.
17.29.2 Function port 2
In a Corrigo with 3 ports, both serial ports have the same function. They can, however, not be
configured to have the same function at the same time.
17.29.3 BACnet communication
In order to connect a Corrigo running a ventilation application to a SCADA system via BACnet/IP
or BACnet MS/TP, a third generation Corrigo with a TCP/IP port or RS485 port is required. For
BACnet MS/TP, a BACnet router must be used. BACnet communication cannot be activated via the
display. It must instead be activated using E tool
©
.
For additional information, see the PICS document and variable list available via www.regin.se.
17.30 Other parameters
17.30.1 Start and stop delays for the fans
Use start delay if you wish one of the fans to start before the other and for example if you wish to
give the close-off dampers time to open before starting the fans. Use stop delay e.g. to create a cool-
down period when using electric heating. In order to avoid letting in too cold air, e.g. in the winter,
the heat exchanger will continue to run during the stop delay.
Delay SAF
Start: 60 s
Stop: 30 s
Delay EAF
Start: 0 s
Stop: 30 s
17.30.2 Retardation time
When switching two-speed fans from 1/1-speed to 1/2-speed there is a settable retardation time. The
same time applies to both fans.