415005 Topvex TR Operation and Maintenance Instructions

Topvex TR800, TR1300, TR1800, TR4000
Operation and Maintenance Instructions
Systemair Inc.
10
3
Press OK button to enter Time. Change time using
the UP/DOWN arrow buttons. Press RIGHT to
select next digit. Press OK when all digits have
been entered and enter date.
Change date using the UP/DOWN arrow buttons.
Press RIGHT arrow buttons to select next digit.
Press OK to conrm.
Change weekday using the UP/DOWN arrow
buttons. Press OK to conrm followed by the
DOWN arrow button
4
To enter Per 1 START time. Change time using the
UP/DOWN arrow buttons. Press RIGHT to select
next digit. Press OK to conrm and enter Per 1
STOP time.
Change time using the UP/DOWN arrow buttons.
Press RIGHT to select next digit. Press OK to
conrm and enter Per 2 START time.
Change time using the UP/DOWN arrow buttons.
Press RIGHT to select next digit. Press OK to
conrm and enter Per 2 STOP time.
Change time using the UP/DOWN arrow buttons.
Press RIGHT to select next digit. Press OK to
conrm followed by the DOWN arrow button.
Time: 12.46
Date: 2010-03-12
Weekday: Friday
Normal speed
Monday → Friday
Per 1: 07:00 - 16:00
Per 2: 00:00 - 00:00
2
Shows the supply air temperature setpoint
Press OK to access the supply setpoint. Enter
password 2222 by pressing OK followed by the UP/
DOWN arrow buttons. Select next digit by pressing
the RIGHT arrow button. Press OK when all 4 digits
have been entered.
Change setpoint value by using the UP/DOWN
arrow buttons, select next digit by pressing the
RIGHT arrow button. Press OK to conrm followed
by the DOWN arrow button.
Supply Air Temp
Setp.: 64 °F