SAVE VTR 150K INSTALLATIONV01 20210316

Delivery, Transport, Storage |
5
3.4.2 Condensation outside of the unit
1. Room temperature 20°C
2. Room temperature 22°C
3. Room temperature 24°C
4. Room temperature 26°C
When the unit is installed in warm humid areas (like laun-
dry) together with low outdoor temperature there is a
certain point where moisture can condense outside of the
casing. The condensation relation to indoor relative hu-
midity, room and outdoor temperature is shown diagram
below. The condensation outside of the unit do not occur
in zones bellow each curve.
Important
Recommendation: If condensation occurs,
increase ventilation in area close to the unit.
Examples when condensation outside of the unit can
occur:
Example A: If the unit is installed in room where tempera-
ture is 22°C, outside temperature is –15°C, then dew will
start accumulating when relative humidity is 46% and
higher.
Example B: If the unit is installed in room where temperature is 20°C, outside temperature is –25°C, then dew will start
accumulating when relative humidity is 34% and higher.
4 Delivery, Transport, Storage
4.1 Transport and storage
The SAVE VTR 150/K should be stored and transported in such a way that it is protected against physical damage. It
should be covered so dust, rain and snow cannot enter and damage the unit and its components.
Important
Use the packaging exclusively as transport protection and not as a lifting aid.
Load and unload the air handling unit carefully.
4.2 Delivery/Unloading
The appliance is delivered in one piece containing all necessary components, wrapped in plastic on a pallet for easy
transportation.
Checking delivery
Check the packaging and the air handling unit for transport damage. Any findings should be noted on the cargo
manifest.
Check completeness of the delivery.
Verify that all ordered equipment is delivered before starting the installation. Any discrepancies from the ordered
equipment must be reported to the supplier of Systemair products.
Warning
When opening the transport packaging, there is a risk of damage from sharp edges, nails, staples, splinters
etc.
Unpacking
Check the air handling unit for visible transport damage.
Only remove the packaging shortly before assembly.
Beware of sharp edges during mounting and maintenance. Use protective gloves.
5 Prerequisites for Installation
To ensure a proper and fail-free operation, it is important that the unit is installed according to these instructions.
254494 | v01