SAVE VTR 300B INSTALLATIONV1

8
| Installation
X* adaptable height according to needs.
Make sure the mounting bracket is completely level.
Follow the ventilation drawing when connecting the unit to the duct system.
6.1 Ventilation Duct Connection and Insulation
Important
Always cover the ventilation ducts during construction period.
Make sure there are no loose objects or impurities inside the ducts.
Install the ducts, supply air diffusers and air intake grilles as shown in the ventilation drawing.
Supply air and extract air ducts must be insulated if located in cold places.
Outdoor air and exhaust air ducts with cold air must be insulated if located in warm places (inside building’s vapour
barrier).
333561 | v1.1