SAVE VTR 300B INSTALLATIONV1

Electrical connections |
9
It is very important to insulate cold ducts and joints tightly without any gaps, otherwise there is a risk of condensation
which may result in moisture damage.
Do not install the ducts directly against structural building elements to avoid sound propagation. Use acoustic insulation
and sound attenuators.
Note:
The type of ventilation ducts and insulation differ for each building and climate zone. If the ventilation
drawing is not provided, please contact your installer or place of purchase for recommendations.
6.2 Installation and Configuration of Accessories
Please follow instructions included with the accessory or consult “Service and Accessories Installation” manual which
can be found in our online catalogue.
7 Electrical connections
The SAVE VTR 300/B is wired internally from factory.
The electrical connection box can be found on the supply air outlet side of the
unit behind a cover plate. The print card (1) can easily be taken out from the
unit.
7.1 Main circuit board layout
The SAVE VTR 300/B is equipped with built-in regulation and internal wiring.
Fig. 4 Main circuit board connections
333561 | v1.1