PKIR-E60S and EKIR-E60S 1396 - CPD - 0069 Round Fire and Evacuation Damper INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS EACH FIRE/EVACUATION DAMPER MUST BE INSTALLED ACCORDING TO THIS INSTALLATION MANUAL!
/8 | PP-87_201701 | PKIR-E60S & EKIR-E60S Introduction Operating Conditions This installation, operation and maintenance manual concerns round fire and evacuation dampers, type PKIR-E60S and EKIR-E60S, manufactured by IMOS-Systemair. It consists of basic information and recommendations concerning the design, installation, start-up and operation, which shall be followed to ensure the proper failfree operation of the unit.
PKIR-E60S & EKIR-E60S | PP-87_201701 | 3/8 1 Installation manual • All connecting ducts to the fire damper must be supported or suspended in such a way that the duct weight would not lean on the damper. Furthermore the damper should not bear any weight from the above or surrounding construction; this can result in distortion of the casing and ultimately malfunctioning of the fire damper.
/8 | PP-87_201701 | PKIR-E60S & EKIR-E60S 1.2 Horizontal installation of the PKIR-E60S (in a vertical duct – Fig.2) It is the same procedure as in 1.1 Vertical installation... (on the figure 2 there is only dry method) 2 Operation manual After installing the damper the actuator needs to be set up into emergency position, meaning that the fire/evacuation damper blade will open/close.
PKIR-E60S & EKIR-E60S | PP-87_201701 | 5/8 3 Fire Damper Functionality Check 4 Damper inspection The damper function is checked when the switch on the thermo-electrical release device is pressed and held as shown in Fig. 6. With the switch you simulate a failure of the thermal electrical release device. It is necessary to hold the switch in ON mode during the whole damper function check.
/8 | PP-87_201701 | PKIR-E60S & EKIR-E60S Operation Journal Activation of the damper Date Description of found defects and date of the following inspection after deficiencies elimination Inspection technician’s signature Periodic damper inspections – at least once in 12 months Date Description of found defects and date of the following inspection after deficiencies elimination Inspection technician’s signature
PKIR-E60S & EKIR-E60S | PP-87_201701 | 7/8 Periodic damper inspections – at least once in 12 months Date Description of found defects and date of the following inspection after deficiencies elimination Inspection technician’s signature
/8 | PP-87_201701 | PKIR-E60S & EKIR-E60S Damper Identification 12 1396 Building object IMOS-Systemair 90043 Kalinkovo 371, Slovakia 1396 - CPD - 0069 EN 15650 : 2010 Fire damper: - all types of PKI-R-E60S Nominal activation conditions/sensitivity: - sensing element load bearing capacity - sensing element response temperature Pass Response delay (resp. time) - closure time Pass Operational reliability: - cycling Emplacement Room no.