Geniox NA Product Guide Specification

Systemair
Geniox
Series
Air Handling Unit
23
72
13
3
1.4
PREINSTALLATION MEETINGS
Specifier Notes: Edit pre installation meetings as necessary. Delete if not required.
A.
Convene pre installation meeting [1 week] [2 weeks] before start of installation of air
handling units
B.
Require attendance of parties directly affecting work of this section, including Contractor,
Architect, Engineer, installer, and manufacturer’s representative.
C.
Review materials, preparation, installation, adjusting, demonstration, protection, and
coordination with other work.
1.5
SUBMITTALS
Specifier Notes: Edit submittal requirements as necessary. Delete submittals not required.
A.
Comply with Section 01 33 00 – Submittal Procedures.
B.
Product Data: Submit manufacturer’s product data, including preparation and installation
instructions.
C.
Shop Drawings: Submit manufacturer’s shop drawings, including plans, elevations, sections,
and details.
1.
Wiring Diagrams: Indicate wiring for each item of equipment and interconnections
between items of equipment.
2.
Include manufacturer’s names, model numbers, ratings, power requirements, equipment
layout, device arrangement, complete wiring point-to-point diagrams, and conduit layouts.
D.
Manufacturer’s Certification: Submit manufacturer’s certification that air handling units
comply with specified requirements and are suitable for intended application.
E.
Manufacturer’s Project References: Submit manufacturer’s list of successfully completed air
handling unit projects, including project name and location, name of architect and engineer, and
type and quantity of air handling units furnished.
F.
Installer’s Project References: Submit installer’s list of successfully completed air handling unit
projects, including project name and location, name of architect and engineer, and type and
quantity of air handling units installed.
G.
Operation and Maintenance Data:
1.
Submit manufacturer’s operation and maintenance manual; including the following:
a.
Operation, maintenance, adjustment, and cleaning instructions.
b.
Troubleshooting guide.
c.
Parts list.
d.
Electrical wiring diagrams.
2.
Provide detailed information required for Owner to properly operate and maintain
equipment.