PART 3 EXECUTION
3.1
SOURCE QUALITY CONTROL
A.
Run test at factory.
3.2
EXAMINATION
A.
Examine areas and supporting structure to receive air handling units.
B.
Notify Architect of conditions that would adversely affect installation or subsequent use.
C.
Do not begin installation until unacceptable conditions are corrected.
3.3
PREPARATION
A.
Prepare surfaces where air handling units are to be mounted.
B.
Ensure surfaces are flat, level, plumb, and can support weight of energy recovery ventilators.
3.4
INSTALLATION
A.
Install air handling units in accordance with industry standards, local codes, and
manufacturer’s instructions at locations
indicated on the Drawings.
B.
Install air handling units in accordance with NFPA 70.
C.
Install air handling unit level, plumb, and secure.
D.
Do not expose electronic components to temperatures below 32 degrees F (0 degrees C) or
above 122 degrees F (50 degrees C).
3.5
ADJUSTING
A.
Adjust air handling units for proper operation in accordance with manufacturer’s
instructions.
3.6
DEMONSTRATION
A.
Demonstration:
1.
Demonstrate that air handling units function properly in every respect.
2.
Perform demonstration at final system inspection by factory-trained and certified
representative of manufacturer.
B.
Instruction and Training:
1.
Provide instruction and training of Owner’s personnel as required for operation and
maintenance of air handling units.
2.
Provide hands-on demonstrations of operation of system components and complete
system, including user-level program changes and functions.
3.
Provide instruction and training by factory-trained and certified representative of