GENIOX VOCLEAN IOM
18
Assembly has been completed successfully
The grey guiding and connection blocks might be installed inside
theunitsontheverticalproles.Pressthesectionshardtogether
sothattherubberprolesaresoatthattheironframesofthe
two sections are joined. Strap with tensioner is suitable for pressing
the sections hard together.
Note! Do not place the strap on the vertical proles. To avoid any
load and stress on the proles the strap must be carefully placed
on the bottom proles of the unit.
The sections must then be locked permanently together with 8
mm bolts and nuts through the grey guiding and connection blocks.
Systemair have provided you the 8 mm bolts with round heads and
nuts required to carry this task out. An Allen key - size 6 - will be
required.
Note! Do not move the sections together by tensioning the 8 mm
bolts and nuts. Tighten the straps for this purpose.
Bracket inside a section. A similar bracket is installed in the next
section. This is the bracket in the Geniox sizes 07.07 to 20.25
Pressthesectionshardtogethersothattherubberprolesareso
atthattheironframesofthetwosectionsarejoined.Strapwith
tensioner is suitable for pressing the sections hard together.
Note! Do not place the strap on the vertical proles. To avoid any
load and stress on the vertical proles the strap must be carefully
placed on the bottom proles of the unit.
The sections must then be locked permanently together with 8 mm
bolts. Nut with threat is installed from the factory in one of
the brackets.
Note! Do not pull the sections together by tensioning the 8 mm
bolts. Use the strap for this purpose.
Figure 14. Section Mounting 2
Figure 15. Inside Bracket
Installation