Mounting Instruction

Align and attach the template to the ceiling. Use the
template to mark the drilling locations through the
paper using a pencil.
Alternatively you can measure the distances of the
dowels inserted in the absorber and mark the measured
distances for the drilling holes at the ceiling.
USING THE TEMPLATE /
DETERMINE THE POSITION
Insert the four screw threads of the wire ropes in the
holder and fasten the screw threads. Make sure that the
wire ropes are guided through the recess of the holder.
FIX THE WIRE ROPE
Drill the holes at the markings using the drilling machine.
DRILL THE HOLES
Screw the four eyelets in the dowels inserted in the
absorber.
FIX EYELETS
Insert the dowels into the drilled holes and fasten the
holder of the wire ropes with four screws M4×40 to the
ceiling.
Make sure that the included screws are suitable for the
condition of the ceiling.
INSERT DOWELS +
FASTEN HOLDER