Installation
Installation: B-0474 Wall Bracket
1. Determine actual measurements (wall to front) and use measurements
below as a guide.
Basin Dim. 20” [50.8cm]
wall to front
8”
[20.3cm]
3 1/4”
[8.3cm]
12”
[30.5cm]
wall
3
B-0475
Allow approx.
length of no.10 to
extend in front of
basin
2. Place no.14 over no.2 and secure with
no.3 and no.15.
3. Drill (3) three 9/32” diameter holes in
wall using no.23 as a guide. Mount no.23 to
receive supply pipes from wall to no.26.
4. Firmly tighten no.24 and no.25 into
no.26. Adjust no.26 if necessary for pipe fi t.
5. Apply tefl on tape or pipe joint compound
to threads. Connect water supply lines, 1/2”
NPT (National Pipe Thread) for 2- inlets,
1-outlet to no.2.
2 inlets
1 outlet
25
24
14
15
23
2 1/2”
[6.3cm]
24,25
26
23
26
outlet
inlet cold
inlet hot
Back View of no.2
wall
mounting
holes
2
3-3/8”
[8.6 cm]
1-31/32”
[5 cm]
3-15/16”
[10 cm]
5
General Instructions