Installation Sheet
4
Installation:
1. Shut off water supply and drain lines.
2. Drill (two) holes for ½” NPT (National Pipe Threads) inlets and (one) ½”
NPT outlets for connections coming from wall. (See drilling dimensions for
hole.)
3. Mount assembly to floor with two no.3’s, allowing 4” [10 cm] or more
from back of unit to wall. Install two (2) inlets (hot and cold sides) and one
(1) outlet.
4. Apply teflon tape or pipe joint compound to threads of supply lines. Con-
nect supply lines with ½” NPT piping.
5. Turn on water and check for leaks.
Note: It is strongly recommented that each supply line be equipped with a
hammer arrester installed per manufacturer’s instructions. A typical installa-
tion is shown:
General Instructions
inlet
outlet
floor
1.207
2.414
1”
1-15/16
Note: Piping and
hammer arrester
supplied by others.
4”
wall
[10 cm]
floor
insert
no.3
Note: To order replacement parts, order the B-50-P parts kit.
(For repair of no.7)
out
in
hammer arrester