Install Instructions
Instruction Sheet
“00” Cartridge Circulators
1
02-054
SUPERSEDES: May 1, 2010 EFFECTIVE: July 1, 2015
P
lant I.D. 001-934
1. Maximum operating pressure is 125 psi (862 kPa).
2. Maximum water temperature not to exceed nameplate rating.
3. Cast iron circulators are to be used for closed loop systems. Bronze or stainless steel circulators are to be used for
 open loop, fresh water, or potable water systems.
4. Taco Cartridge circulator pumps are for indoor use only – employer uniquement a l´interieur.
1. Mounting  position  –  Circulator  must  be  mounted  with  the  motor  in  a  horizontal  position.  It  may  be  mounted
 vertically with the motor up, provided that the system pressure is at least 20 psi (138 kPa).
2. Rotating body – Body has an arrow on the front that indicates direction of flow. To rotate body, remove the four body 
 bolts, rotate body and replace bolts. Make sure that the junction box is NOT located underneath the circulator. (The 
 junction box must NOT be located in the 6 o’clock position, as viewed from the motor end.)
3. Electrical connections –  Observe all applicable  codes when connecting  to  power  supply. The motor is impedance 
 protected,  and does  not require  overload protection.  Either colored  wire from  the capacitor  box can  be attached  to 
 either colored wire from the power supply. There is no “hot” or “common” wire leading from the capacitor box. Typical 
 installation would be to attach the white wire to the white (common) power supply wire and either the yellow or blue
 wire to the black (hot) power supply wire. The pump cannot run backwards.
             
            
               
4. Fill system with tap water – The system must be filled before operating the circulator. The bearings are water lubri-
 cated and should not be allowed to operate dry. Filling the system will result in immediate lubrication of the bearings.
 It is always good practice to flush a new system of foreign matter before starting the circulator.
5. Circulator operation – Operate the circulator for 5 minutes immediately after filling system to purge remaining air from
 the bearing chamber. This is especially important when installing the circulator during the off-season.
            


