User Manual

Library Security Pedestal 2
24/62 Revision 4.2 July 2008
b. Cement floor: Drill eight holes with a diameter of 8 mm for the cement floor plugs and
one hole with a diameter of 19 mm for the cable access. It may be necessary to provide
a groove for the power supply cable connected to the L-SP2 Electronics Unit. Insert the
concrete floor plugs into the mounting holes.
3. Remove the pedestal from the box.
4. Remove the plastic cover from the both sides after removing the 4 fixing screws.
Figure 10: L-SP2 Bottom (4 screws)
5. Engage the power supply cable in the electric sheath and if available the Ethernet cable in the
other sheath (please refer to section 4.1.1 “Wire Feed Sheaths”).
6. Place the pedestal base over the mounting holes. Insert and fasten the screws in the mounting
holes according to the type of ground surface:
Wood floor: Insert the screws directly into the mounting holes and tighten the screws in
place.
Concrete floor: Insert the screws into the concrete floor plugs and tighten the screws in
place.
7. Connect the cables in the connection box as show in Figure 2 with respect to the following
rules:
CAUTION: Always use a protective sleeve for main power cable, which match to the non-
inflammability standard. Main power cable must be a 3 wire (line, neutral and earth), multi
stranded copper wire, 0.5 mm²/ 3A)
When tightening the screws in place, first tighten the screws in place ¾ of the way. Once all
screws are in place, then tighten each screw progressively, one after each other to ensure
that the floor bracket is solidly fixed into place and completely vertically aligned. The use of a
level may be required.
‘Phase’ wire is brown
‘Neutral’ wire is bleu
‘Ground’ wire is yellow/green