User Manual

Installation
July 2008 Revision 4.2 25/62
8. Once all the L-SP2 pedestal have been installed, close the micro circuit-breaker (Figure 3) to
power up the system before starting configuration operations. Please see section 5
Configuration”.
9. After the configuration has been carried on, replace the two plastic covers and tighten the 4
fixing screws.
AC mains 110/220V. Be sure that there is no power supply current before carrying on the
connection operation. To do so, the micro circuit-breaker must be opened. (Figure 3)