User Manual

Configuration
July 2008 Revision 4.2 29/62
5.2.4 Synchronization by Wire
In this case the L-SP2 configuration settings are not to be changed. There will always be one
L-SP2 Master and others pedestals set as Slaves. Each pedestal is connected to the other using a
twisted pair cable.
Wire connection:
1. Unscrew the 4 screws to open the plastic panel
2. Unscrew the 9 screws to open the metallic cover
Figure 13: I/O port support
3. Use a thin sharp screwdriver to insert the wire terminal inside the I/O port 4 hole (please
see below Figure 14.
Figure
14
: Wire disposition
4. Repeat this sequence for each L-SP2 pedestal to connect each I/O port 4 together
5. Power up the whole system (every pedestals must be powered up) and check that the
synchronization process works properly
6. Replace the panels
5.3 Configuration of the Ethernet Interface
Don’t forget to power up your installation before carrying on the following steps
I/O port
support
1 2 3 4 GND
LSP2 #1
LSP2 #2
LSP2 #3
1 2 3 4 GND