User_Manual_Taisync_Pro_V1.00(ETH-ETH)-EN-20200529
13
3.2.Ground unit installation
3.2.1. Attenna installation
Insert the air unit antennas into the RF ports with RF cables. RF cables clicks in when properly
installed.
Note:
(1) To avoid equipment damage, install antennas before powering on the units.
(2) When install air unit to drone, avoid the antennas being blocked by parts of the drone.
(3) Both antennas need to be installed.
(4) Ensure the antenna connector is vertical to the module when it is pushed into the RF
port.
(5) When uninstall the antenna, hold the connector and pull it out of the RF port. Do not
pull the cable.
3.2.2. Power supply










