User's Manual

TUNet PP-1316 Install Guide page 3
Doc No. KT-109967
2 :: Installing the PP-1316
Before the PP-1316 can be installed, the Itron SENTINEL® must be programmed with initial
configuration settings.
Warning
Energized meters, meter sockets and distribution lines present the risk of
electrical shock. All work on this equipment should be performed by qualified
metering specialists or industrial electricians. Personnel working with this
equipment should follow all utility company established operation and safety
procedures.
2.1 Equipment Required
The following equipment is required to program the Itron SENTINEL®:
Meter socket (or equivalent) to power up the meter to be programmed
ANSI Type 2 optical coupler
Itron Communication Manager Version 9.5 or later
Windows XP compatible computer