User's Manual

TUNet Single Phase Retrofit Guide
P/N 900-0006 Proprietary and Confidential
9
2.5.2 TC-1210 Meter Module (GE I-210)
1. Remove the GE I-210 meter from its base.
2. There are two power leads that connect the circuit board to the meter base. Depress the release levers in order to
disconnect the leads as shown in the figure below.
Figure 8: Disconnect the GE I-210 Power Leads
3. With the cover of the GE I-210 removed from the meter base, insert the TC-1210 module into the GE I-210 cover.
4. There are alignment holes on the I-210 cover which correspond to alignment pins on the TC-1210 module.
5. With the alignment pins mated to the holes, a slight amount of pressure will engage the plastic latches that hold the
TC-1210 firmly in place.
Figure 9: GE I-210 and TC-1210 Alignment Points
6. The TC-1210 will appear slightly rotated in relation to the GE I-210 circuit board which is the correct configuration
7. Connect the small 10-pin connector from the TC-1210 module to the GE I-210 board.