Installation Guide

1. Choose the correct size and strength Mono-Post for the project
based on construction documents (Fig.1)
2. Adjust screw to slightly short of the length needed between
footer and load carrying beam at installation location
3. Place Mono-Post vertically between footer and beam with the
adjustment nut and screw on the footer (adjustable end down)
4. Adjust screw to wedge the Mono-Post between footer and beam,
tighten until Mono-Post is firmly centered directly under the load
carrying beam and the footer below (Fig. 2)
5. Additional screw adjustments may be made during construction
to keep floor level
6. Poured concrete basement floor permanently locks Mono-Post
adjustment (Fig.3)
TAMPERPROOF ADJUSTMENT: MONO-POST SHOULD BE
POSITIONED WITH ADJUSTMENT NUT AND SCREW AT THE
FOOTER.
Note: Always consult Local Building Codes for specific installation
requirements in your area.
Installation InstructionsInstallation Instructions
MONO POSTSMONO POSTS
Installation Time: Approximately 15 Minutes
Tools Required: None
Fig. 2
Fig. 1
Fig. 3
pg.
12
®
AKRON
The AkronProducts Company
Made in the U.S.A. • © 2011 The Akron Products Company - FLOOR-MONO081711
10721 South Water Street Ext. Meadville, PA 16335 Phone: 330 576 1750 Fax: 330 576 1755 e-mail us: info@akronproducts.com•.. ..

Summary of content (1 pages)