Installation Instructions

ID_20200914_EN_VERICORE_FLOATING_&_VERICORE_ON_STAIRS
Page 1 of 8
© 2020 Tarkett USA Inc. 09/2020
VERICORE® FLOATING LUXURY VINYL PLANK
INSTALLATION INSTRUCTIONS
INTRODUCTION
These instructions are written as a guide to be used when installing Tarkett Flooring. These instructions, combined with our adhesives and flooring
products, create a system. Utilizing this system will ease the installation process and provide the customer with a completed product that will perform to
its intended purpose. Always visit www.tarkettna.com for the most current installation and maintenance instructions. Technical videos and tip sheets are
also available. Contact Tarkett Technical Services at (800)-899-8916 with any questions.
GENERAL INFORMATION
1.
Vericore must be stored horizontally on a sturdy base at all times.
2.
Cartons must be stored horizontally on a sturdy base at all times.
3.
Protect carton corners from damage.
4.
Carefully check flooring material for any defects. Contact your supplier immediately if any defect is found.
5.
Tarkett floors are intended for indoor use only
6.
Room temperature shall be between 65º F and 85º F (18.3° C -29.4° C) for 48 hours before and during installation. Vericore does not require
acclimation to the jobsite conditions prior to installation. Refer to SPECIAL NOTES section below.
7.
Exposure to direct sunlight can result in Vericore® fading and creates excessive heat directly on the finished flooring and surrounding structure
which may result in movement. During peak sunlight exposure, the use of drapes or other window treatments are recommended.
8.
Remove all existing transitions, quarter round, baseboard molding, or cove base prior to beginning the instalaltion.
9.
Undercut doorway moldings to the thickness of the flooring.
10.
Do not use foam padding under Vericore.
SPECIAL NOTES
When installing Vericore in a Residential applications with fully operational HVAC, transition moldings are not required at egress doorways
or between rooms, regardless of overall size of the installation.
Vericore may be installed in fully-enclosed spaces that do not have permanent heating and cooling systems in operation. These spaces
include seasonal vacation homes, lake cabins, 3 season rooms, etc. The room temperature shall be 55° - 95°F (12° - 35°C) for 48 hours
before and during the installation. The use of temporary temperature controls may be needed during this period. Vericore shall be installed in
these spaces with a full ½” expansion gap at all vertical surfaces. NOTE: When installing Vericore in these applications a transition
molding must be placed at egress doorways and when installations span greater than 40’ in any direction.
When installing Vericore in Light Commercial applications, a transition molding must be placed at egress doorways and when installations span
greater than 40’ in any direction.
WOOD SUBSTRATES
Vericore may be installed over single floor wood construction in residential applications only. Allow a 1/2” (12.7mm) space for installations over
wood substrates that may be effected by moisture or external temperature and humidity fluctuations (i.e. crawlspaces, mobile homes) or
when installing in areas without permanent HVAC controls (3 season rooms, seasonal vacation homes and cabins).
Subfloor must meet the following requirements:
1.
Wood joist or truss systems spacing must be a maximum of 16” on center. Wood or joist truss systems spacing of 16”-19.2 is acceptable for
double wood layer construction
2.
Subfloor panels must be dry, sturdy, smooth and dimensionally stable.
3.
Subfloor panels must be 3/4” minimum thickness tongue and groove plywood or oriented strand board (OSB).
4.
Subfloor panels must be good one side, and have a fully sanded face with a solid core (no voids).
5.
Subfloor panels must be exterior grade or classified as Exposure I.
6.
All suspended wood subfloors must have at least 18” of well-ventilated air space clearance above the ground. The ground
under the crawl space
shall be covered with 10 mil or thicker polyethylene sheeting to reduce moisture vapor transmission.
7.
Offset subfloor panel joints by at least 16” so that four corners do not meet.