Instructions / Assembly
Assembly of the trampoline Mat
To assemble the trampoline Mat, use the
Spring tool(#8) to load on the Spring(#7) and
connect it to the Top frame(#3), as shown in
Figure 2.1
2.2
Start ① point
②
③
④
⑤
⑥
⑦
⑧
• Place the trampoline Mat (#1) on the floor in the Interior of the
frame assembled.
• Select a starting point (point ①) in the frame and load on the
first Spring(#7). To keep the tension on the mat balanced, then
go to the opposite site to load on the second spring on point ②,
then point ③, then point ④, and so on.
• Continue to attach the remaining springs in the middle of the
previously attached springs until all springs are installed.
Spring(# 7)
Triangular Rings
Trampoline Mat(# 1)
Top fram e(# 3)
Spring Tool (# 8)
①Point
12
2.1