Full Product Manual

INSTALLATION PROCEDURE
Use safety protective clothing and protective wear when installing lift.
DO NOT install this lift outdoors unless special consideration has been made to protect the power unit from
weather conditions. The Power unit is not waterproof!!!
DO NOT begin installation with lift close to wall. It is necessary to leave adequate clearance for installing
safety linkage rods. Allow 1524mm for clearance. (See Fig.1)
NOTE The power unit can be placed in one of two locations, front left or rear right (See Fig. 1)
STEP 1: After unloading the lift, place it near the intended installation location.
STEP 2: Remove the shipping bands and packing materials from the lift. The power unit will be unpacked
from the top. Note: Be care-ful not to drop power unit on heavy end
STEP 3: Open the wrapping, remove the parts and parts boxes from the packaging. Unbolt the structure
from the shipping brackets. (Use proper lifting devices, cranes or a forklift to lift o of shipping brackets.)
Step 4: Before assembling lift stand the columns in place making sure to position the power unit mounting
bracket at the correct location and the lock blocks are positioned facing outward. The power unit column will
be positioned with the power unit ramp DANGER When removing the lift from shipping angles pay close
attention as the posts can slide and can cause injury .Prior to removing the bolts make sure the posts are
held securely by a fork lift or some heavy lifting device.
TORIN COMMERCIAL EQUIPMENT
21 REV 190425