Full Product Manual
5. The columns and Cross Tubes will now be in
position and spaced properly for the Runways.
1. Before proceeding it will be necessary to rst
raise the Cross Tubes o the ground to facilitate
Cable routing and nal assembly.
2. Manually raise the Cross Tubes until the
primary Safety Locks engage and rest on the
Lock position 6th from the bottom of the Ladder or
comfortably o the ground. It is important that the
SECONDARY SAFETY LOCK IS CLEARED.The
SECONDARY Safety Lock must never rest on the
Safety Ladder.
3. The Columns and Cross Tubes will now be in
positon and spaced properly for the Runways.Be
very careful not to disturb the Columns and Cross
Tubes at this time as they may tip over causing
personal injury or harm.
DANGER
Be careful not to disturb the Columns and Cross
tubes as they maytip over causing personal injury
or harm.
IMPORTANT NOTE!
It is important that the SLACK SAFETY LOCK IS
CLEARED.The Slack Safety Lock must never rest
on the Safety Ladder.
STEP 2
(Raising The CROSSBEAMS)
DANGER
Secondary
Safety
Primary
Safety
Dual Safety Locking Mechanism
Secondary Safety
should be positioned
as shown.
Primary
Safety
TORIN COMMERCIAL EQUIPMENT
25 REV 190425