Full Product Manual

Crossbeam
w/SINGLE-sheave
cut out
Crossbeam
w/DOUBLE-sheave
cut out
Hydraulic
bulk head
tting
Install powerside
runway
Install non-powerside
runway
Runway Installation
Start with the runway with the cylinder. This runway will be located with the hose connection facing
out toward the column with the power unit bracket attached.
Note: The power unit can be located as shown.
With a crane, lifting device or forklift pick up and place one end of the power-side runway on the
crossbeam, and then pick up and place the other end of the opposite crossbeam (with your assis-
tants, lift at the same time.
Use a large screwdriver or aligning punch to align the mounting moles in the cross rails with the
mounting holes in the track. Do no leave the runway unbolted, INSTALL THE MOUNTING BOLTS
IMMEDIATELY.
Install M12x100mm mounting and M12 washers thru the ramp brackets and wheel stops. Make sure
the bolt head is on the at side of the bracket.
Install the oside track and again secure with ramp bracket, wheel stops with M12x100mm bolts and
nuts.
After both tracks are installed, tighten all bolts M12x100 and torque to specied torque rating 78-lbs.
Powerside
Post
TORIN COMMERCIAL EQUIPMENT
26 REV 190425