Full Product Manual
1/2” Minimum
Install each nut
until 1/2” Minimum
of threads are
exposed
4. Tighten each Nut until there is at least one inch
of threads protruding through the top of the nut.
The cables will remain loose until start up and
nal cable adjustments are made.
Install the Front
Tire using four
M14*2*40 Hex
Bolts. Nuts and
washers
Drive Up Ramp
Hinge Pin
Optional Drive
up Ramp Locks
Wheel Chock
STEP 14
(Attaching the Approach Ramp/Tire Stops)
1. Install the Front Tire Stops at the forward side of
the li using the 18” steel rods and cotter pins.
2. Install the Approach Ramps on the entry side
of the li (install the 4 Optional Drive Up Ramp
Locks, if desired to keep the drive Up Ramps from
Flipping down
5. After routing the cables double-check to make
sure all are properly positioned and remain within
the grooves of all sheaves.
TORIN COMMERCIAL EQUIPMENT
31 REV 190425