1.Use your measurement markings to center and locate lift. Once this has been accomplished, the column
base plate will be used as a guide for drilling the 3/4” diameter holes into the concrete. DRILL THE ANCHOR
HOLES ONLY FOR THE “POWERSIDE COLUMN”, installing anchors as you go. NOTE: Drill through con-
crete slab (recommended) this will allow the anchor to be driven through the bottom of slab, if the threads are
damaged or if the lift will need to be relocated.
(See Foundation, Anchoring Requirements, and Anchoring Tips Instructions.)
2.Using a level, check columns for side-to-side plumb and front-to-back plumb. If needed, use shims provided
by placing shims underneath the base plate and around the anchor bolt. (Shim thickness must not exceed 1/2”)
This will prevent bending the column bottom plates. Tighten the (2) 3/4” anchor bolts 2 to 3 turns.
3.Using a tape measure, measure from back corner of the base to the opposite back corner to insure columns
are square. After conrming dimensions, install the anchors.
Note: (Verify column is secure standing alone before beginning next procedures. If needed have
another team member secure column standing before performing next steps.)
To estimate the shim requirements, place a target on oor at each Column position and record the readings,
Find the highest of the four locations then nd the dierence between each of the remaining Columns, This
dierence is the estimated amount of shim thickness that will be required at each Column,(see Fig)
Note. The maximum shim thickness
recommended by the factory is no more than 1/2”
per Column using shims and anchors provided
with the lift