Instructions

37
CHAPTER 3: INSTALLATION
3.1 General
This chapter contains instructions for initial inspection, preparation for use and repackaging for
shipment. Connection to PC, setting the communication port and linking Z
+
power supplies are
described in Chapter 7.
NOTE:
Z
+
power supplies generate magnetic fields which might affect the operation of other instruments.
If your equipment is susceptible to magnetic fields, do not position it adjacent to the power supply.
3.2 Preparation for Use
In order to be operational the power supply must be connected to an appropriate AC source. The
AC source voltage should be within the power supply specification. Do not apply power before
reading, Section 3.6 and 3.7.
Table 3-1 below, describes the basic setup procedure. Follow the instructions in Table 3-1 in the
sequence given to prepare the power supply for use.
Step no. Item Description Reference
1 Inspection Initial physical inspection of the power supply Section 3.3
2 Installation
Installing the power supply,
Ensuring adequate ventilation.
Section 3.4
Section 3.5
3 AC source
AC source requirements
Connecting the power supply to the AC source.
Section 3.6
Section 3.7
4 Test Turn-on checkout procedure. Section 3.8
5 Load connection Wire size selection. Local /Remote sensing. Section 3.9
6 Default setting Single or multiple loads. Section 7.2.1
Table 3-1: Basic setup procedure
3.3 Initial Inspection
Prior to shipment this power supply was inspected and found free of mechanical or electrical defects.
Upon unpacking of the power supply, inspect for any damage which may have occurred in transit.
The inspection should confirm that there is no exterior damage to the power supply such as broken
knobs or connectors and that the front panel and meter faces are not scratched or cracked. Keep
all packing material until the inspection has been completed. If damage is detected, file a claim
with carrier immediately and notify the TDK-Lambda sales or service facility nearest you.
3.4 Rack Mounting
The Z
+
power supply series is designed to fit in a standard 19” 2U height rack.
Six units (70mm width) can be assembled into 19” 2U-rack. Refer to Fig.3-1.
Four units (105mm width) can be assembled into 19” 2U-rack. Refer to Fig.3-2
Fig.3-1 Fig.3-2