Information
Product Specification
108-5262
Rev. C6 10 of 14
Para.
Test Items Requirements Procedures
3.5.24
Dust Bombardment Must meet the specified
requirements after testing in
the sequence specified in Fig.9.
Subject mated connectors to
ejection of Port 1 and cement or
Kanto loam dust powder dispersed
by compressed air blowing at a
rate of 1.5kg per 10 seconds at
every other 15 minutes for the
total of 1 hour. After completion of
duration, repeat mating /
unmating for 3 cycles.
3.5.25
Temperature Rising
50℃ max.
Must meet the specified
requirements after testing in
the sequence specified in Fig.9.
Subject mated connectors with all
the contacts series wired, to be
energized with the current of the
intensity obtained by Fig.6.
Measure temperature rising in a
draft-free chamber after
temperature becomes stabilized.
3.5.26
Water Sprinkle Must meet the specified
requirements after testing in
the sequence specified inFig.9.
Current Leakage:100μA max.
Suspend mated connector in a
closed chamber. Subject it to heat
at 120±3℃ for 40 minutes
followed by sprinkling of water at
room temperature for 20 minutes.
Making this a cycles, repeat for 48
cycles per JIS D 0203. S1.
Energize the contacts with
12VDC, and monitor the circuits
for current leakage. Connected 2
meter lead wires are drawn out of
the chamber for measurement.
3.5.27
Compound Environ-
mental Testing
(Optionally performed
by customer’s
requirements)
Must meet the requirements
after testing in the sequence
specified in Fig.9.
Subject mated connectors, with all
the loaded contacts series-wired
as shown in Fig.7, to 44m/s
2
(4.5G)
Vibration to reciprocate between
20-200 Hz one cycle every 3
minutes for 100 hours each to
three axial directions. Measure
termination resistance (low level)
at completion of each axis
vibration cycle. During vibration,
apply test current of the intensity
obtain by Table 1, for 45 minutes
ON, and 15 minutes OFF for 300
cycles, in the heat cycle test
condition to reciprocate between
80±3℃, -30±3℃, in 80-95%
R.H. atmosphere. Fig.8.