User manual

Application Specification 114-106078
Jul 11
th
, 2013 Rev. C1
This specification is a controlled document. Page 3 of 12
© Copyright 2012 by TE Connectivity Corporation
All rights reserved
TE internal test report: 501-106078
TUV cert. reference document: EN 50521
3 Requirements
Do NOT disconnect under load!
Current path should only be disconnected using approved disconnect devices.
Symbol Do not disconnect under load is marked on the connectors
Connectors should always be protected from silicon sealant (Oxime) during
mounting, connectors should be assembled onto the Junction box which has
been mounted on the panel modules for certain exposed time to cure silicon
sealant (Oxime) properly. Recommended exposed time is 4 hours at least.
Recommended panel lay method
Mounting and installation must be done by qualified and trained staff considering
all applying safety regulations. Failure to follow all instructions in Application
Specification (available at www.te.com/documents), including using only
approved TE tooling (if applicable), can result in improper installation and/or
crimping which is dangerous and may cause or contribute to electrical fires.
Do NOT use any oil or lubricants during mounting.
PV4 connector can intermate with PV industry preference connector as last
option but not preferred.
3.1 General Instructions
Any kind of pollution (dust, humidity, foreign particles etc.) during the assembly process can
degrade contact and connectors performance. This applies in particular to the seals and the
crimping of the contacts. A clean assembly environment is therefore essential.