User Manual

31
82
9
123
125
19
36
Step E-24Step E-24
Step E-24Step E-24
Step E-24
1. Slide the Battery Box (125) into place on the back of the Chas-
sis (19). The top flange of the Battery Box should fit between the Rear
Shock Tower (123) and the Gearbox (82). The back of the Chassis
should fit snug into the recess in the bottom of the Battery Box. Be
sure that all the holes line up.
2. Place a gold Ball Stud Washer (9) over each of the 4-40 x 1/2"
Cap-Head Screws (31). Secure the rear Shock Tower (123) and Bat-
tery Box to the Gearbox Halves (82)(83) by threading the 4-40 x 1/2"
screws, with Washers attached, through the rear Shock Tower and
Battery Box, into the Gearbox Halves.
3. Secure the bottom of the Battery Box to the Chassis with two
4-40 x 1/2" Flat-Head Screws (36).
Battery Box Install:
BB
BB
B
AA
AA
A
G E (ContinG E (Contin
G E (ContinG E (Contin
G E (Contin
ued)ued)
ued)ued)
ued)
27
9
31
Figure E-24
36