Installation Sheet

1
Preparing the Canopy
Mount the crossbar assembly to the electrical box with
the two provided #8-32 screws.
Remove the crossbar from the canopy by completely
unscrewing the center strain relief.
SET SCREW
Loosen the set screw on each strain(Do Not Remove)
relief.
920GMBMP19
1.0
700GMBMP19_
2
6
#8-32
SCREW
CROSSBAR
22
CENTER STRAIN
RELIEF
CROSSBAR
CANOPY
3
5
Line an anchor tip with the center of an anchor holes,
and push the anchors into the wall up to the threads.
Screw the anchors in the rest of the way with a Phillips-
head screwdriver.
Slide each #8 screw through a washer, and screw them
into the anchors to secure the mounting plate.
3
4
5
GP I :ENERAL RODUCT NFORMATION
This product is suitable for damp locations.
These fixtures are intended to be installed
utilizing NEC compliant junction boxes.
This product can be dimmed with a LED or TRIAC dimmer.
Consult lamp manufacturer for additional information.
This instruction shows a typical installation.
CAUTION RISK OF FIRE-
This product must be installed in accordance with
the applicable installation code by a person familiar
with the construction and operation of the product
and the hazards involved.
Use minimum 90°c supply conductors.
1
1B
1A
1B
1D
1C
Gambit 19-Light Chandelier
Installation Instructions for
CHANDELIER

Summary of content (4 pages)