Installation Sheet
2
ANCHOR
CEILING
Tap the anchor at the marked point into the wall up to
the threaded portion with a hammer.
1D
6
11
Screw the anchor in the rest of the way with a Phillips
screwdriver.
7
1E
#8 SCREW
THREADED WASHER
15
1G
Screw the threaded washer onto the anchor with the
long #8 screw.
10
1F
THREADED
WASHER
CABLE POST
Unscrew the threaded washer to separate it from the
cable post.
8
THREADED WASHER
1H
CABLE POST
Tightly screw the cable post back onto the threaded
washer.
11
12
Mark the cable post location point at 47” or 93” away
from the center of the junction box if using one post.
Mark both locations for two posts.
1C
5
47”
or
93”
1I
CABLE POST
Determine the desired hanging height and cut aircraft
cable to length.
Feed the aircraft cable into the cable post and tighten
the set screw with the provided Allen wrench.
Repeat Steps 1D - 1H for the other post if using two.
9
SET SCREW
12
ALLEN WRENCH
13
AIRCRAFT CABLE