Installation & Assembly

1
Installation Instructions for
Fiama 24 and 30 Suspension
Prepare the Canopy
#8-32
SCREW
CROSSBAR
Mount the crossbar assembly to the electrical box with
the two provided #8-32 screws.
Remove the crossbar from the canopy by completely
unscrewing the decorative bolt.
920LSFIA
DECORATIVE
BOLT
CROSSBAR
CANOPY
1A
1
1B
2
2 2
1.1
700FIA_
SUSPENSION
CAUTION - RISK OF FIRE
This product must be installed in accordance with
the applicable installation code by a person familiar
with the construction and operation of the product
and the hazards involved.
Use minimum 90°c supply conductors.
Using the provided Allen wrench, loosen (Do Not
Remove) the set screw on each strain relief.
Place the fixture on a level surface.
Evenly pull the three coaxial cables through the canopy
until it reaches the length desired.
Install the inner bushings onto each coaxial cord and
slide them down and into the strain reliefs.
Ensure that the canopy is level and re-tighten the set
screws on the strain reliefs.
CANOPY
STRAIN
RELIEF
SET SCREW
COAXIAL
CABLE
ALLEN
WRENCH
1C
3
4
5
BUSHING
BUSHING
STRAIN
RELIEF
GP I :ENERAL RODUCT NFORMATION
This fixture is intended to be installed utilizing NEC
compliant junction boxes.
This product is suitable for damp locations.
This product may be dimmed with a low-voltage electronic
dimmer.
6
7













































































































































































































Summary of content (4 pages)