User Manual Owner manual

37
98-05239 R1 EN
HOME OVERVIEWSETUP POWERAPPENDIX FULL SCREEN INTRODUCTIONGUIDANCE
Implement - SmartCable or SDM
Implement Setup is used to establish number of boom sections, guidance width, spray width, overlap percentage, implement delay on
time and implement delay off time.
Note: If a SmartCable or Section Driver Module (SDM) is not present the configurations for Number of Boom Sections, Overlap, Delay
On and Delay Off will not be available - only Guidance Width and Spray Width can be entered. Please refer to Single Boom
Setup to view setup steps.
1. Press CONFIGURATION side tab .
2. Press
Implement .
3. Select from:
►Number of Boom Sections
#
– used to select the number of available boom sections
►Guidance Width – used to enter the width between the guidelines
►Spray Width – used to enter the width of each implement section
►Overlap
– used to select the amount of overlap allowed when the boom sections are turned on and off
►Delay On
– used to enter the timing for the boom section valves to switch on
►Delay Off
– used to enter the timing for the boom section valves to switch off
4. Press RETURN arrow
or CONFIGURATION side tab to return to the main Conguration screen.
NOTE: Press or to switch between Implement setup screens.
Figure 6-12: Implement Setup Options with SmartCable or SDM
Conguration
Vehicle
Implement
AutoSteer
Tilt
Lightbar
GPS
Video
Cong->Implement
Num Sections
Spray Width
Guidance Width
20.00 m
21.00 m
15
Cong->Implement (2)
Overlap
Delay O
Delay On
1.00 s
1.00 s
50%