Submittal Sheet
Job __________________________
Designer ______________________
Contact _______________________
www.tekmarcontrols.com of 2 © 20 C 26 - 0/
0/
HVAC Systems
Replaces: New
Front View
Side View
2–7/8”
(72 mm)
1/2” Knock-out
(x 5 back) (x 5 bottom)
Mounting Base
CL
1/2”
(13 mm)
7/8”
(23 mm)
6–5/8”
(170 mm)
7–5/8”
(193 mm)
1–7/8” (49 mm)
1/2”
(14 mm)
Ø 3/16” (5 mm)
------------
Outdoor Reset
Setback input for energy savings
Warm Weather Shut Down
Automatic Boiler Differential
----------------
2 Stage boiler control
Quick setup for easy installation and
programming of control
User comfort adjustment to increase or
decrease building space temperature
Advanced settings to fine-tune building
requirements
Pump exercising
Powered boiler pump output
Test sequence to ensure proper
component operation
20 V (ac) power supply
•
•
•
•
•
•
•
•
•
•
•
•
-----------------------------------------------------
N / A
Two Stage Boiler & Setpoint
Literature D26, A26, D00, D070
Control Microprocessor control. This is not a safety (limit) control
Packaged weight 3.0 lb. (340 g)
Dimensions 6-5/8” H x 7-9/6” W x 2-3/6” D (70 x 93 x 72 mm)
Enclosure Blue PVC plastic, NEMA type
Approvals
CSA C US, meets class B: ICES & FCC Part 5
Ambient conditions
Indoor use only, 32 to 3°F (0 to 45°C), RH ≤90% Non-
condensing
Power supply 20 V (ac) ±0%, 50/60 Hz, 300 VA
Relays 240 V (ac) 0 A, /3 hp
Demands 20 to 260 V (ac) 2 VA
Sensors NTC thermistor, 0 kΩ @ 77°F (25°C ±0.2°C) ß=3892
–Included Outdoor Sensor 070 and Universal Sensor 082
–Optional tekmar type #: 033
Warranty Limited 3 Year (See D26 for full warranty)
Two Stage Boiler & Setpoint
58033
Boiler
Demand L N NL 1 1 2 2 Sw
2
Boil Uno Com Boil Out Com
3 4
5
6
7
8
9 0
2 3
4
5 6
7
Power
Stage Stage
Advanced
Installer Off
Rotate
Item
Test
Made in Canada by
tekmar Control Systems Ltd.
Power: 120 V ±10% 50/60 Hz 1300 VA
Relays: 240 V (ac) 10 A 1/3 hp, pilot duty 240 VA
Demands: 20 to 260 V (ac) 2 VA
Terminal Unit Setpoint
Fire Delay Setpoint Demand
Boiler Demand
Signal wiring must be
rated at least 300 V
Use supply wires suitable for
120°F (50°C ) above ambient
Setpoint
Demand
H11068
ROOM
-
Set to desired room temp.
OUTDR DSGN
-
Set to coldest (design)
outdoor temp.
Terminal Unit Set to
High Mass Radiant ------- 1
Low Mass Radiant ------- 2
Fan Coil ------------------ 3
Convector ---------------- 4
Radiator ------------------ 5
Baseboard --------------- 6
Setpoint - Set to desired setpoint temp.
Refer to brochure for more information
To increase or decrease the
building temperature.
• Press the Item, , buttons
simultaneously for 1 sec. to
enter the ADJUST menu
• Use the, , buttons to adjust
the ROOM setting
Display defaults back to VIEW
menu after 20 sec.
The Boiler Control 26 is designed to stage multiple boilers using outdoor reset. It can be used in applications ranging from a single
zone of baseboard, multiple baseboard and fan coil zones, to dedicated setpoint heating in commercial buildings. This control regulates
a single heating water temperature through outdoor reset and/or setpoint target control. It is capable of controlling (stage and rotate)
up to 2 on/off boilers, or a single 2 stage boiler, as well as the system pump.