Installation Guide

INSTALLATION GUIDELINES
Use drive bit listed on the front. Drill through
material until head is properly seated.
Underdriven Correctly Driven Overdriven
• Use a standard screwgun with a depth
sensitive nosepiece
• For optimal performance, screwgun should
be a minimum of 4 amps and 0-2000 RPM
• Fastener must penetrate beyond metal a
minimum of 3 pitches of thread
• Overdriving may result in torsional failure of
fastener or stripout of substrate
1/4"
HEX
• Use a standard screwgun with a depth sensitive nosepiece
• For optimal performance, screwgun should be a minimum of 4 amps and 0-2000 RPM
• Fastener must penetrate beyond metal a minimum of 3 pitches of thread
• Overdriving may result in torsional failure of fastener or stripout of substrate
• Utilice una pistola atornilladora estándar, con punta detectora de profundidad
• Para lograr un desempeño óptimo, la pistola atornilladora debe tener como mínimo 4
amperios y una gama de velocidad de 0 a 2000 RPM
• El tornillo debe penetrar más allá del metal por lo menos 3 pasos de la rosca
• Un apriete excesivo puede producir una falla torsional del tornillo o un desroscamiento del sustrato
Sugerencias para la instalación
Installation Tips

Summary of content (1 pages)