Instructions
CP030 Current Probe
5-2 ISSUED: September 2005 CP030-OM-E Rev B
PRELIMINARY PROCEDURE
1. Connect the CP030 to the channel 1 input of the oscilloscope
and completely close the probe slider.
2. Turn the oscilloscope on and allow at least 30 minutes warm-
up time for the CP030 and test equipment before performing
the Verification Procedure.
3. Turn on the other test equipment and allow these to warm up
for the time recommended by the manufacturer.
4. While the instruments are reaching operating temperature,
make a photocopy of the Performance Verification Test
Record (located in Appendix A), and fill in the necessary
data.
FUNCTIONAL CHECK
The functional check will verify the basic operation of the probe
functions.
It is recommended that the Functional Check be performed prior
to the Performance Verification Procedure.
1. Select Channel 1 and verify that the probe bandwidth is set to
Full.
2. Verify that the CP030 is sensed and the CP030 tab appears
in the channel menu.
3. Degauss the probe by pressing the DEGAUSS button and
selecting OK (located on the CP030 dialog).
4. Verify that "Performing Degauss on CP030...." is displayed at
the bottom of the screen and no error message remains dis-
played.
Banana Plug Adapter Female BNC to Dual Banana Plug Pomona 1269
Patch Cables (4 required) Male Banana to Male Banana, 12" Pomona B-12-0 (black), B-12-2 (red)
BNC Adapter BNC Male to Dual Banana Jack Pomona 1296
Description Minimum Requirements Test Equipment Examples