User's Manual

2
o Energyconsumptionandsavings
(The connection method must be configured using the onscreen options on the device. Refer to the
document“ProjectSpecificGuidelines”todeterminemeansofcommunication)
4. Components:
ThefollowingcomponentsareincludedintypicalPACE4installations.Theirpurposeand
otherdetailsshallbecoveredduringtraining.
SummaryofSteps
1. InitialHVACData/HVACSurvey
:Agoalof theprojectistocomplete,for eachsite,a100%HVACsite
surveyprovidingthemanufacturer,mo delnumber,equipmentconditionnotes,andretrofitsinstalled.AWeb
linkutilityto assistinthissurveywillbe provided toyou.TheWeblinkisto asitewithpull
downmenusto
allow anyone withan Internetconnected mobiledevice (phone, tablet, laptop) to enter site HVAC data and
conditionnotes,anduploadittoadatabaseforthecustomertoreview.ThelinkbelowistotheWeblink: