User's Manual

Arad Technologies LTD. Confidential
Page 2 of 6
Arad Technologies Requirements For Receiving
Marketing Requirements Document (MRD)
1. Background
The Allegro Wall Mount unit is now at validation phase. It was agreed that in order
to shorten the validation cycle, MM will get R&D samples for testing.
2. Document scope
This document presents the issues that can be tested by MM.
3. Installation
Step 1 – Wall mount spacer assembly
o Put a t-wrap in the spacer, the t-wrap is needed for tightening the
communication cable to the spacer, so in case the cable is pulled it will not be
cut out from the unit.
o Connect the spacer to the wall.
Spacer orientation -