User's Manual
Section 6 - Wiring (Continued)
35
TABLE 2(C) TR12 2-SPEED
PROGRAMMING DIAGRAM.
2-SPEED, 2-WINDINGS: ALL MOTIONS
MOTOR 1 CONNECTIONS MOTOR 2 CONNECTIONS MOTOR 3 CONNECTIONS
J4-3 HOIST UP J3-3 TROLLEY DIR 1 J2-3 BRIDGE DIR 1
J4-2 HOIST 1
ST
SPEED J3-2 TROLLEY 1
ST
SPEED J2-2 BRIDGE 1
ST
SPEED
J4-1 HOIST DOWN J3-1 TROLLEY DIR 2 J2-1 BRIDGE DIR 2
J4-4 HOT (J4-1, 2 & 3) J3-4 HOT (J3-1, 2 & 3) J2-4 HOT (J2-1, 2 & 3)
J5-6 HOIST 2
ND
SPEED J5-4 TROLLEY 2
ND
SPEED J5-2 BRIDGE 2
ND
SPEED
J5-5 HOT HOIST 2
ND
SPEED J5-3 HOT TROLLEY 2
ND
SPEED J5-1 HOT BRIDGE 2
ND
SPEED
NOTE
CHECK GOVERNMENTAL AND LOCAL REGULATIONS ON THE REQUIREMENTS OF HORNS OR ALARMS
BEFORE USING THIS CONFIGURATION, AS THERE IS NOT A SEPARATE ALARM CONTROL.
TRANSMITTER SWITCH SETTINGS
tele
Pilot
USE PDA SCREEN (Program the configuration switches to match the pattern and position shown).
MEMBRANE USE SW3 āCā
PENDANT, JLTX AND SLTX USE SW4 āDā
TRANSMITTER SWITCH SETTINGS: Position-5 Position -6 Position -7
OFF ON OFF
*NOTE: Hoist, Trolley and Bridge are listed here as traditional configurations, the installer may choose to define the
motors differently.
OFF
1 2 3 4 5 6 7 8
ON
For these switch
positions see
previous section.
Indicates Switch in OFF Position.
OUTPUTS
J2-3
J2-2
J2-1
B
RIDGE
*
MOTOR 3
1
ST
2
ND
Dir 1 Dir 2
OUTPUTS
J4-3
J4-2
J4-1
H
OIST
*
MOTOR 1
1
ST
2
ND
UP DN
2
ND
1
ST
2
ND
1
ST
OUTPUTS
J3-3
J3-2
J3-1
TROLLEY
*
MOTOR 2
1
ST
2
ND
Dir 1 Dir 2
2
ND
1
ST
J5-2J5-6 J5-4