User's Manual

EcoSource Low Voltage Installation
Figure 20: EcoSource Backplate with UL-Rated Insulating Tape
JBOX Using Horizontal Mud Ring Instructions
Requires:
Speed nut that accommodates a #6-32 1” screw.
two #6-32 1-inch screws
1 hole to be drilled into backplate (drilling performed onsite or by Telkonet Production prior to
shipping if requested in advance.)
Step 30 Ensure the JBOX has been installed with a horizontal mud ring.
Step 31 Unless this was done prior to shipping, drill a hole in backplate as shown in Figure 21. The
horizontal distance between the hole and the inner right side of the plate should be 1.0”. The
vertical distance between the hole and the inner right side of the plate should be 1 ¾”. The
hole should accommodate a #6-32 1” screw.
(Preferred method for low voltage new construction)
EcoWave Featuring EcoTouch IO&M Guide Telkonet, Inc.
For Use with Firmware Version 2.x 20800 Swenson Drive, Suite 175
EcoSour ce Waukesha, WI 53186
Revision 2 (800) 380-9640
Page 20 www.telkonet.com