System Manual

Table Of Contents
Page 13
condition. The CPE should be properly grounded for proper protection against lighting or
power surge.
To power on the device, the outdoor CPE must use a 48V PoE integrated DC power supply
adapter. The power adapters can operate in 100-240V AC range and therefore can be used
in different country. Once the device is powered up, the user should wait for about 2 minutes
before the device becomes operational. When the RUN LED becomes solid green, it indicates
the system has completed the startup procedure.
To connect PC, LAN switch or other type of IP device to the CPE product, the user should use
standard CAT5 Ethernet cable and connect to the appropriate LAN port. Once connected,
the ETH LED indicator should come on.
Installing Outdoor Unit (ODU) Pole Mount