Use and Care Manual

1. Rail Assembly
A. Mark the top of side bands at 16” on center starting at front of both sides
B. Install end joist
C. See detail at front there is double joist and a single at back
D. Use #12 ext. Tek screws F7 through pre-punched holes to attach joists (center joists on marks)
E. Continue to fill between the ends with the other floor joists
F. Recommended to face joists same way but not required
G. The end joists solid portion should face out
H. Now you are ready to block and level
I. Square floor and anchor it
J. Attach decking of your choice
K. Refer to additional size table for more squaring instructions
REV. 022014
16